Back to selected work

01 / Early education

123+ Education Center

Shanghai, China / July–October 2017

Shared spaces between the classrooms

The center occupies both sides of a public mall corridor. Curved openings and layered thresholds connect focused rooms with shared spaces for movement, play, and learning.

My role

Design Development · 3D Modeling · Construction Drawing Review & Coordination · Site and Delivery Coordination

After the Studio Principal established the overall concept, I developed the interior design and 3D model, reviewed construction drawings, coordinated key details, and supported site, client, and contractor coordination through completion.

Project

Project type
Early education
Location
Shanghai, China
Date
July–October 2017
Area
424 sqm / 4,564 sq ft
Status
Built

Team credit

Project by OfficeOffCourse. Overall concept and design direction: Studio Principal.

Recognition2019 Architizer A+Awards, Popular Choice Winner: Kindergartens and Architecture +Learning. Project recognition for OfficeOffCourse. Official record

01

Built result: shared learning spaces

The completed center opens classrooms onto shared areas for movement, play, and learning. Curved thresholds, child-scaled built-ins, and the suspended ceiling composition give the public spaces a clear identity.

02

3D model / Built result

I developed the 3D model after the overall concept was established, using it to refine curved partitions, built-in elements, sightlines, and the ceiling composition. The completed interior shows those relationships carried through to construction.

03

Detail drawing / Built finish

The aquarium-enclosure section records proportions and material transitions reviewed during detail coordination. The completed reception area shows how curved joinery, timber lining, and framed openings were resolved as a consistent finish language.

04

Construction coordination / Completed result

Paired reception and corridor records show the project moving from unfinished site conditions to the completed interior. Site follow-up supported design adjustments and coordination with the client and contractor through delivery.